Nottingham Trent Bridge Refurbishment

Cleveland Bridge took on the role of Principal Contractor for the rehabilitation works. The project involved painting all steel and cast-iron elements on the bridge, encompassing a total area of more than 11,000m2.

  • Year: 2020
  • Location: Nottingham, England
  • Client: Nottingham City Council and Nottinghamshire County Council
Download Case Study

Requirement

The Grade 2 listed Trent Bridge is a steel, cast-iron and stone road bridge across the River Trent in Nottingham. It is one of the principal river crossings into the city from the south. Nottingham City Council and Nottinghamshire County Council needed to find an experienced bridge rehabilitation specialist to carry out ongoing corrosion-resistance work to prevent degradation of the historic structure, and to secure its long-term loadcarrying capacity.

Grade 2

Listed building

More than 11,000m2.

Painted

120m2

Gold leaf applied

Solution

In the tender process, Cleveland Bridge achieved the highest quality score of all bidders and was appointed to deliver the high-profile seven-month maintenance programme. The works were carried out during the period of Covid-19 lockdown restrictions, which meant careful planning was required to maintain social distancing and associated safety measures.
Through close collaboration between the Client and project team, Cleveland Bridge was able to adjust the works programme to allow simultaneous working on two bridge spans, rather than working on them sequentially. This enabled social distancing to be maintained, while keeping the works within the planned programme time.

Challenges

In addition to rearranging the works programme to mitigate the risk Covid-19 related delays, Cleveland Bridge had to manage the work around a three-week closure of the site at the height of the pandemic. On top of this, storm conditions and high river levels further inhibited the project.

Challenges

Further complications were added as unscheduled emergency works were ongoing on the adjacent Clifton Bridge, which meant the Client required Trent Bridge to remain open at all times. Cleveland Bridge quickly had to problem solve and devise a way to deliver the full programme of rehabilitation works safely, without the need to close any of the traffic lanes. The solution involved a number of creative methods, including transferring all scaffold material by river-going pontoon, instead of lifting it over the bridge parapet from a delivery vehicle.

Outcome

Despite the unexpected delays, closures and restrictions imposed by external factors, Cleveland Bridge managed to keep the programme within the original timeframe, with no detriment to the quality or safety of the works completed.
The bridge remained open to traffic and the public throughout, which meant this essential bridge rehabilitation was completed with no disruption to bridge users.
Cleveland Bridge was able to achieve the exemplary standards of workmanship and aesthetics required by the council for this Grade 2
heritage structure.

Cleveland Bridge were a pleasure to work with. Whatever delays or obstructions were thrown at them, they managed to find effective ways to complete the extensive repairs and repainting works on time and to an extremely high standard. Their efforts mean this much-loved structure will retain its heritage appeal for many more generations, while providing the structural strength needed for modern-day traffic.

Chris Capewell CEng MICE Nottingham City Council