Sabiya Power Plant

  • Year: 1997
  • Location: Kuwait

Requirement

The Sabiya Power Plant located north Kuwait has a total full-load cooling water of 100m³ per second. Cleveland Bridge was contracted by Hyundai Engineering and Construction to do the connection design, detail drawing, supply, fabrication, delivery and erection of 22,000 Tons of structural Steel.

Stay up to date with the latest CBUK news