Requirement

The Humber bridge in Northern England is one of the worlds longest suspension bridges with a main span of 1,410m. It is a tolled crossing carrying six lanes of traffic across the Humber estuary.

Technical Specification
- Main span: 1,410m
- Southern side span: 530m
- Northern side span: 280m
- Deck steel: 17,000 tonnes
- Cables: 11,000 tonnes