Requirement

Canary Wharf station is part of the Crossrail project and incorporates an underground rail station, an above ground retail park and a roof top garden development.

Cleveland Bridge’s scope of work varied slightly on each element, for example the design of connections was not required in each element, but included preparation of drawings, site surveys, supply, fabrication, application of surface protection – including in tumescent paint for some elements – and erection of steelwork, which involved both bolted and site welded elements. Cleveland Bridge were also responsible for supply and fitting, including grouting, of bearings for the elevated walkway, Upper Bank Street Bridge and Park Level +1. Several of the elements also involved supply and fitting of metal decking.