Bahrain Flyover Bridge

  • Year: 2013
  • Location: Bahrain

Requirement

The flyover bridge Cleveland was contracted to fabricate and install was a steel arch tied suspension bridge which is 122.5m long, 16m wide and 21.4m high which is designed for pedestrian traffic.

The 16m wide bridge deck is a concrete post tensioned construction and the entire bridge was constructed at an offsite facility about 250m away from the permanent location across Prince Khalifa Bin Salman Highway and was moved into placed with two end piers using SPMT vehicles.

Construction on the bridge began in September 2012 and was completed in January 2013.

Cleveland Bridge and Engineering Middle East (Private) Limited scope was fabrication, detail, supply, paint and erection of The Structural Steel Arch Rib.