A45/46 Tollbar End Improvement Scheme

To improve the A45 Stonebridge Highway and the Tollbar End roundabout in southern Coventry. This improvement is part of a package of works which also includes the M40, junction 15 bypass. The main completed project will significantly reduce the volume of traffic using Tollbar End roundabout, by providing a two lane dual carriageway underpass link between the A46 Coventry Eastern bypass and the A45 Stonebridge highway.

  • Year: 2015
  • Location: Coventry, England
  • Client: Highways Agency
Download Case Study

Requirement

To improve the A45 Stonebridge Highway and the Tollbar End roundabout in southern Coventry. This improvement is part of a package of works which also includes the M40, junction 15 bypass. The main completed project will significantly reduce the volume of traffic using Tollbar End roundabout, by providing a two lane dual carriageway underpass link between the A46 Coventry Eastern bypass and the A45 Stonebridge highway. The existing roundabout was enlarged to improve all the existing accesses, and the existing A45 Stonebridge highway increased to a three lane carriageway between the new Tollbar End junction and Stivichall junction to improve capacity and allow traffic to manoeuvre safely into the required lane on approach to the junctions.

Stay up to date with the latest from Cleveland Bridge