A14 Cambridge to Huntingdon

Chosen for our proven track record and vast experience in large-scale bridge construction Cleveland Bridge have been appointed to construct six new bridges along this stretch of road.

  • Year: 2019
  • Location: A14, England
  • Client: A14 Integrated Delivery Team (IDT), a joint venture between Costain, Skanska, Balfour Beatty and Atkins/CH2M (now Jacobs)
Download Case Study

Requirement

The A14 Integrated Delivery Team (IDT) is working on behalf of Highways England to deliver a £1.5billion scheme to improve the A14 trunk road between Cambridge and Huntingdon. The aim is to relieve congestion, unlock economic growth, improve safety and enhance the local environment.

7825

Tonnes of fabricated steel

750m

Total length of viaduct over the river great ouse

11 hours

Two bar-hill bridges installed within

Solution

Leading steel bridge construction company Cleveland Bridge was appointed to fabricate and construct six major new bridges on the section of the new A14 between the A1 and Cambridge.

Challenges

Each bridge presented different engineering and construction challenges, alongside the need to complete works on schedule in coordination with other trades and contractors

Outcome

Value engineering innovations introduced by Cleveland Bridge on a number of projects helped to save time and reduce costs for the client, enabling project deadlines to be achieved while minimising disruption to road users and local residents.

It should not be underestimated how much we as main contractors depend on reliable and professional supply chain partners, which you truly are.

Ondrej Humplik Construction Manager, A14 Integrated Delivery Team