Project Completed: 2018

About the project

Main contractor FM Conway chose Cleveland Bridge to fabricate, deliver and install the bridge over the canal. Chosen for its proven expertise in bridge installation projects in urban environments, and for its ability to meet the timescales of the project.

The main challenge for this project was installing a bridge over a navigable waterway. This required possession of the canal and closure to all canal traffic. To minimise disruption, Cleveland Bridge completed the installation during a single overnight possession window.