skip to main content
Our work

Sheffield Events Arena

Project Completed: 1990

About the project

Cleveland Bridge’s contract scope for Sheffield Events Arena included the detailing, fabrication, protective treatment, delivery and construction of the arena roof and associated support steelwork. The structure was built to modular “Takanaka” design with clear spanning dimensions of 120m x 80m. It was the first of this type in the UK with CBUK contributing a total of 1,400te to this project.

Download
Project PDF

Get in touch

To find out more about our products and services please get in touch