Sabiya Power Plant

Project Completed: 1997

About the project

The Sabiya I Power Plant located north Kuwait has a total full-load cooling water of 100m³ per second. Cleveland Bridge was contracted by Hyundai Engineering and Construction to do the connection design, detail drawing, supply, fabrication, delivery and erection of 22,000 Tons of structural Steel.