Nottingham Express Transit Bridges

Project Completed: 2013

About the project

In 2011, Cleveland Bridge were awarded a multi-million pound contract to fabricate and erect five steel bridges in Nottingham as part of the works associated with phase 2 of the Nottingham Express Transit (NET). The largest of the structures in Cleveland’s scope of work was Nottingham Station Bridge; fabricated in the company’s 27,000m2 fabrication facility in Darlington from jumbo circular hollow sections up to 711mm in diameter. With a total length of 105m its purpose was to connect the South of Queen’s Road to the current tram networks terminus, providing a new tram stop on completion.

Once transported to site, the fabricated truss bridge was assembled at ground level in twelve separate sections before being erected onto a series of high level temporary erection trestles. This work was conducted in two phases utilising a Liebherr LTM 1500 crane. In February 2013, half of the structure was erected and incrementally launched, with the remaining sections completed by April of the same year.

Download
Project PDF

Get in touch

To find out more about our products and services please get in touch