Humber Bridge Refurbishment

Project Completed: 2019

About the project

Cleveland Bridge UK Ltd was appointed as principal contractor to conduct a 12-month inspection of the iconic bridge’s main cables. This would be the first detailed inspection since a new dehumidification system was installed in 2010 to prevent corrosion and extend the life of the bridge cables. 

Cleveland Bridge will complete the inspection of eight main cable panels, as well as providing cable material sampling, sample preparation and associated laboratory works.

Download
Project PDF