Golden Valley M5 Bridge

Project Completed: 2001

About the project

The existing Golden Valley Interchange carries the A40 across the M5 motorway span. Prior to strengthening by Cleveland Bridge in 2001, it had been subject to stringent weight restrictions. For strengthening, the provision and erection of steel box columns, crossheads and lateral tie beams were used. All site activities were undertaken in a strictly sequential and controlled manner, with a high level of interface with the main contractor.

Get in touch