Dubai Olympic Sports Complex

Project Completed: 2010

About the project

The exceptional design of this building has turned it into an unforgettable structure in Dubai, used to host swimming and diving Olympic competitions, as well as other sports events and activities. It is also a venue for hosting exhibitions and entertainment shows, by covering the swimming pools and transforming them into dry floors used. This is done through pumping the swimming pools water into a tank in the energy building responsible for providing all the energy to the entire main building.

Cleveland Bridge scope of work was the connection design, detail, supply, fabrication, painting (including intumescent fire protection) delivery and erection of structural steel. Structural steel connection were all bolted with no site welding. Due to the large clear spans temporary propping was required to reduce lift weights to optimize craneage efficiency be it single or tandem lift.

Get in touch

To find out more about our products and services please get in touch