Bridge
Strengthening and Retrofit
Bridges
are a long term investment for road and rail infrastructure: throughout
their lives they require maintenance and repair and, with the huge growth
of traffic and traffic loads, they require strengthening and adaptation
for greater capacity.
Tamar Bridge Strengthening, England |
The Rodenkirchen Bridge project
typifies, on a grand scale, the challenges of bridge retrofit work,
which include
- the priority on maintaining
traffic flow
- technical complexity of
engineering the changes
- understanding the structure
as it is modified
- dealing with materials
of unknown or obsolete specification
- ensuring the safety of
the bridge users and the workpeople
- maintaining the integrity
of the structure
- maintaining the quality
of a landmark structure,
and indeed the retrofit process can be much more demanding than
building a new bridge
|
Cleveland Bridge has been associated
with retrofit work on many historic bridges including the Menai Straits
Suspension Bridge and Tower Bridge in London. Such projects range from
minor works to major long duration contracts, but every one presents risks
for the client and requires a competent experienced bridge contractor.
Over the last few years Cleveland
Bridge has acquired substantial experience in this field and can offer
a first-class service to bridge owners in the UK and, for larger projects,
worldwide.
Experience
Record
|
Year
|
Bridge
|
| 1990 |
Forth
Road Bridge, Edinburgh, Scotland
Strengthening of main tower bracing members for increased
loading. |
| 1994 |
Rodenkirchen
Bridge, Cologne, Germany
Doubling width of existing suspension bridge, in joint
venture |
| 1998 |
Northwich
Town Bridge, Cheshire, England
Major retrofit of historic swing bridge |
| 1998 |
Irlam Railway
Bridge, Irlam, England
Sub-contractor for retrofit and new steel deck for
existing bridge |
| 1999 |
Golden Valley
M5 Bridge, Gloucester, England
Sub-contractor for replacement of concrete piers with
splayed steel box piers to reduce spans of overbridge |
| 2000 |
M5 Avonmouth
Bridge, Bristol, England
Principal sub-contractor for complete retrofit of
17 span box girder bridge over five years |
|
2001 |
Tamar
Bridge, Saltash, England
Main contractor for widening and redecking 40 year
old suspension bridge |
| 2004 |
Tinsley Viaduct, Sheffield, England
Strengthening 1033m long, 20 span,
double deck steel box girder viaduct, in partnership |
|
2004 |
Aston Expressway (Tame Valley Viaduct), Birmingham, England
Inspection of interior, production
of report and budget costs for strengthening works |
|
UC07 |
Tay Road Bridge, Dundee, Scotland
Main contractor for the replacement
of bearings, internal strengthening and replacement of concrete
diaphragms |
|