Marine Structures
Our engineers can apply their
expertise to a range of moving structures including ro-ro ramps, tidal
barriers, dock gates and shiplifts. A strong in-house design
resource brings together the skills necessary to provide
multi-disciplined turnkey solutions. We offer:
-
conceptual project
studies and design development
-
full working design
and shop detailing
-
fabrication and
erection
-
complete construction
packages
-
construction
engineering for the most challenging of projects
-
installation of power,
service and control systems
-
temporary works and
erection schemes
|

Thames Barrier, London |
Experience Record
|
Year
|
Project
|
| 1980 |
Dover Ro-Ro Facility, Dover,
England
A design and
construction of two Roll-on Roll-off bridge systems for the Western
Docks, Dover. Each deck is 54m x 9m and as individual components
weigh 64te each. The dolphins weigh 150te |
|
1982 |
Thames Barrier, London, England
Supply and erection of 9,600 tonnes of fabricated
steel gates, plus installation of mechanical and hydraulic operating
machinery |
| 1991 |
Faslane Ship Lift, Scotland
Manufacture and installation of primary
shiplift steelwork comprising 72 tonne main transfer beam,
articulated units and cast hanger beams. Total project tonnage
4,126 tonnes. |
| 1992 |
Faslane Transfer System, Scotland
Manufacture, installation, commission
and testing of transfer system including 77 transfer cradles.
Total project tonnage 1,150 tonnes. |
| 1994 |
Colne Barrier, Essex, England
As mechanical,
hydraulic and electrical specialist subcontractor, designed,
manufactured, installed, tested and commissioned the gates and their
operating and control systems |
| 2000 |
Colne Barrier Maintenance, Essex,
England
Cleveland Bridge’s scope was to plan, prepare, unstep
and step 2 No. Mitre Gates including maintenance on the sill flap
mechanism and re-commissioning. |
|