|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Gallery - Bridge Retrofitting
![]() |
Rodenkirchen Bridge,
Cologne, Germany 1994 - Doubling the width of a suspension bridge (378m span) CB |
![]() |
Northwich Town Swing Bridge,
Cheshire, England 1999 - Complete structural and mechanical refurbishment of an historic structure CB |
![]() |
M5 Avonmouth Bridge,
Bristol, England 2000 - Widening and strengthening of a 17 span box girder motorway bridge CB |
![]() |
Tamar Bridge, Saltash, England 2001 - Widening, strengthening and re-decking the bridge built by Cleveland Bridge in 1961 (584m span) CB |
![]() |
Golden Valley M5 Bridge,
Golden Valley, England 2001 - Replacement of piers with steel supports to reduce spans of concrete deck CB |
![]() |
Tinsley Viaduct, Sheffield, England Under Construction - strengthening of 20 span, double deck steel box girder viaduct (1033m span) CB |